Free Construction Estimate Template (PDF Generator)

Scope the job by division, price the allowances honestly, list upgrades as optional lines, set the deposit and milestone draws, and download a PDF the owner signs from their phone.

  • Real PDF download, not a print dialog
  • Optional add-ons priced outside the total
  • Deposit line and signature block built in
  • Converts to an invoice in one click

Updated September 4, 2026 · By Keith Peiker, working restoration contractor

Build your estimate

Your business

Saved once, reused on every document you make here.

Add your logo to the top-left of the document.

Customer

Estimate details

Line items

1
Amount$0.00

Tip: press Enter in the last Rate box to add another row.

Totals

Payment & notes

Payment methods accepted

Saved in this browser only — nothing is uploaded.

Accent
ESTIMATE
Prepared for
Job / project
Line items
DescriptionQtyUnitRateAmount
Subtotal$0.00
Total$0.00
Payment methods
Credit card · Check · Cash
Terms
This estimate is valid until the date shown above. Pricing may change if the scope of work changes or if hidden conditions are found once work begins. A deposit is required to schedule the work; the balance is due on completion unless otherwise agreed in writing.
Accepted by
Signature
Date
Thank you for your business.
Powered by TrustPro · trustpro.io
Total$0.00
Prefer a blank template? Download the fillable estimate — no signup.

A construction estimate is the first draft of the contract and the schedule of values you will bill against for the next three months. Every division you price here becomes a line on a pay application later, every allowance becomes a reconciliation, and every assumption you leave out becomes a change order argument. The generator below starts with a primary-bath remodel — eight divisions, two allowances, permit fees at cost, two optional upgrades and a 10% deposit — that you can overwrite with your own job.

Below the tool: what a general contractor's estimate has to contain, how to structure deposits and milestone draws (including where the law caps the deposit), how to handle allowances and unknowns, what to say about permits and change orders, and what happens after the owner signs.

How to write a construction estimate

  1. Add your business and license

    Company details, logo and the license or registration number required on the proposal.

  2. Enter the owner and the project address

    Name, contact details and the property.

  3. Number and date it, and set the valid-until date

    The number is prefilled; set a validity window that reflects material pricing.

  4. Write the scope by division, one line each

    Demolition, framing, rough plumbing, electrical, tile and finishes as rows, with the specifics that prevent arguments in the details.

  5. Add allowances, permits and exclusions

    Allowances with the per-unit basis; permits and inspections with who pulls them; exclusions in writing.

  6. Set the payment schedule, deposit and change-order process

    Milestone-based payments and the deposit (within any state cap) in the notes; how changes get priced and signed; upgrades marked Optional.

  7. Download, send, and convert when signed

    Text or email the PDF. When the owner signs, untick Optional on accepted upgrades and press Convert to invoice.

What to include on a construction estimate

Scope by division, one line each
Demo, rough plumbing, electrical, tile, drywall and paint — priced separately. These lines become your schedule of values, so name them the way you will bill them.
Exclusions, in writing
Structural repairs found after demo, asbestos abatement, painting outside the room, furniture moving. What is not included is half the estimate.
Allowances with the per-unit basis
"Tile allowance $6/sq ft, 210 sq ft" tells the owner what their selection budget is and how the overage will be calculated.
Permits, inspections and who pulls them
"We pull the permits and schedule inspections; fees billed at cost." Owners rarely know this is a question until it is a problem.
Payment schedule tied to milestones, not dates
Deposit on signing, a draw when rough inspections pass, a draw when tile is complete, balance at final walkthrough. Inspections are the milestones nobody can argue with.
Deposit amount and any state cap
Some states limit what you can take up front — California caps home-improvement deposits at 10% or $1,000, whichever is less. Know your state before you print a number.
Change-order process
"Any change in scope, including hidden conditions, is priced on a written change order signed before that work proceeds." One sentence, printed, saves the job.
Optional upgrades, priced
Heated floor, frameless glass, the hall bath toilet while the plumber is there. Optional lines under the total sell upgrades without a second estimate.
Schedule and working hours
Start window, duration, days and hours on site. Owners plan their lives around it and blame you when it is not written down.
Warranty, license number and valid-until date
Workmanship term, pass-through of manufacturer warranties, your license or registration number, and a 30-day validity.

What should a construction estimate include?

Scope by division, the assumptions and exclusions behind each price, allowances and how they reconcile, the payment schedule, permit and change-order rules, and the calendar. That is more than most trades put on an estimate because a general contractor is pricing three months of other people's work against the owner's tolerance for surprises.

Price each division on its own line the way you will bill it. "Bathroom remodel — $18,365" is a number; "Demolition and disposal — $2,400 · Rough plumbing — $3,800 · Electrical — $2,150 …" is a schedule of values the owner can read, a bank can fund, and you can bill in three progress applications. The details line under each says what is included — "cement board, waterproofing membrane, thinset, grout and sealer" — so waterproofing is never a debate.

  • Exclusions. Structural repairs found after demo, hazardous materials, work outside the room, furniture moving and storage.
  • Allowances with the unit basis and the statement that they reconcile at cost on the final invoice.
  • Permits: who pulls them, fees at cost, inspections gate the draws.
  • Payment schedule tied to milestones, with the deposit stated.
  • Change-order rule, schedule and hours, warranty, license number, valid-until date.

The seven-step method in how to write an estimate for a construction job — including the markup-versus-margin math that trips up half the trade — is the process behind this page.

How should a general contractor structure the deposit and draws?

Deposit on signing, then draws at inspections and visible milestones, with the balance at the final walkthrough — sized so the owner has always paid for roughly what has been built. On a mid-size remodel that is a modest deposit, two or three draws and a final payment; on a small job, thirds. The table below is this page's bathroom sample.

The deposit is where state law bites. California's Contractors State License Board says a home-improvement down payment "cannot be more than $1,000 or 10 percent of the contract price, whichever is less," with no exception for special-order materials, and adds that subsequent payments should not exceed the value of work completed or materials delivered. Several other states cap deposits at a third of the contract price; some do not cap them at all. The contractor deposit guide lists the ones verified against the statute; print a deposit that is legal in your state and let the draws carry the protection.

Milestone draw schedule for the sample bathroom remodel ($18,365)
MilestoneShareAmountWhy here
Signing10%$1,836.50Holds the schedule
Rough plumbing and electrical inspections pass40%$7,346.00The inspector confirms the work nobody can see
Tile complete40%$7,346.00Visible and photographable
Final walkthroughBalance$1,836.50Punch list done, allowances reconciled

Tie draws to inspections: a calendar date is arguable; a passed rough inspection is a fact with a city stamp on it. And take the deposit the minute the owner signs — the acceptance block and a card or ACH link on the PDF turn "I'll get you a check" into money in the account.

How do you handle allowances and unknowns in a construction bid?

Allowances for what the owner has not picked yet; unit prices for what you cannot see yet; a written change-order rule for everything else. An allowance is a placeholder budget — "tile allowance $6 per sq ft, 210 sq ft, reconciled at cost on the final invoice" — that lets you price the job before the owner has been to the tile showroom. Set it at a realistic mid-range number: a $2 allowance that becomes a $9 selection makes the overage look like your fault.

Unknowns get a unit price instead of a guess. "Subfloor replacement, if required after demolition: $14 per sq ft" is a price the owner already agreed to when the rot shows up, and it turns a bad afternoon into a two-line change order. For what you can neither price nor predict — a slab that is not where the plans say, knob-and-tube in the walls — say it is excluded and priced on a written change order before work proceeds.

Optional lines are upgrades, not unknowns
Optional add-on lines are for the heated floor and the frameless glass — things the owner might want. Contingency does not go there; a contingency the owner can decline is not one.

What should the estimate say about permits, inspections and change orders?

That you pull the permits, that fees are billed at cost, that inspections gate the draws, and that nothing changes without a signed change order. Owners assume the first three and forget the fourth, so the change-order sentence is the one to read aloud: any change in scope, including hidden conditions found after demolition, is priced on a written change order signed before that work proceeds.

That sentence is close to the law in some states. California's CSLB tells consumers a change to price or scope "MUST be done with a written 'Change Order,' signed by the customer and contractor prior to the change." Other states are looser on paper and identical in court: the change you cannot show a signature for is the change you eat. The free change order template produces the signed document in about a minute on a phone, roughly how long an owner will wait in a half-demolished bathroom.

Permits protect you as much as the owner: a permitted job with passed inspections is one an owner cannot later call defective without arguing with the city. Put permit fees on their own line at cost, non-taxable, and say who schedules the inspections. An owner who wants to skip the permit to save the fee is a customer to think hard about; how to vet a customer before you quote exists for that conversation.

How long is a construction estimate valid, and what happens after acceptance?

Thirty days, because material prices and your calendar both move: a bid priced in March against lumber and cabinet quotes does not survive a June signature untouched. Print the date; if the owner signs after it, re-confirm the material lines before taking the deposit instead of quietly absorbing the difference.

After acceptance, the signed estimate is the contract's scope and price, and its divisions become the schedule of values. Convert to invoice carries the accepted lines, the customer and the deposit into the invoice generator — for a progress-billed job that first invoice is application #1, and you replace each full division amount with this period's earned fraction. The general version is the free estimate template; the construction invoice page covers the progress-billing mechanics.

If you want the deposit collected before you leave the driveway
Full disclosure, TrustPro is ours. The general contractor CRM sends the estimate by text with an approve-and-pay link, takes the deposit by card or ACH, converts the approved estimate to an invoice, and follows up until the owner answers — with a customer-vetting network for checking who you are about to spend three months with. Core is $29 a month, Teams is $149 for up to five users, both with a 14-day free trial and no credit card. This generator stays free either way.

FAQ

How detailed should a general contractor's estimate be?

Detailed enough to bill against. Price each division — demolition, rough plumbing, electrical, tile, drywall and paint — on its own line with what it includes, because those lines become the schedule of values for your progress invoices. Add exclusions, allowances, permits, a payment schedule and the change-order rule.

How much deposit can a general contractor take?

It depends on the state. California caps home-improvement down payments at 10% of the contract price or $1,000, whichever is less; several states cap them at one-third; others set no limit. Check your state's contractor board, then let a milestone draw schedule carry the rest of the protection.

What is an allowance on a construction estimate?

A placeholder budget for a selection the owner has not made yet — tile, fixtures, a vanity — stated with its unit basis, such as $6 per square foot. When the owner chooses, the actual cost replaces the allowance and the difference is billed as an overage or credited back on the final invoice.

Should draws be tied to dates or milestones?

Milestones, and ideally inspections. A passed rough-in inspection is a fact the owner cannot dispute; a calendar date is an argument waiting to happen. A common residential schedule is a deposit on signing, draws at rough inspection and at a visible stage like tile complete, and the balance at final walkthrough.

Do I need a written change order for every change?

Yes. Some states require it — California's CSLB says a change to price or scope must be a written change order signed by both parties before the change — and everywhere else an unsigned change is unenforceable in practice. State the rule on the estimate and use a change-order form that shows the revised contract total.

How long should a construction estimate be valid?

Thirty days is the working norm. Material prices and your schedule both move; if the owner signs after the date, re-confirm the material and allowance lines before taking the deposit.

Should permit fees be included in the estimate total?

Yes, as their own line billed at cost and marked non-taxable, with a note that you pull the permits and schedule the inspections. Owners should see the fee, and see that it carries no markup.