Free Construction Estimate Template (PDF Generator)
Scope the job by division, price the allowances honestly, list upgrades as optional lines, set the deposit and milestone draws, and download a PDF the owner signs from their phone.
- Real PDF download, not a print dialog
- Optional add-ons priced outside the total
- Deposit line and signature block built in
- Converts to an invoice in one click
Build your estimate
Saved in this browser only — nothing is uploaded.
| Description | Qty | Unit | Rate | Amount |
|---|
A construction estimate is the first draft of the contract and the schedule of values you will bill against for the next three months. Every division you price here becomes a line on a pay application later, every allowance becomes a reconciliation, and every assumption you leave out becomes a change order argument. The generator below starts with a primary-bath remodel — eight divisions, two allowances, permit fees at cost, two optional upgrades and a 10% deposit — that you can overwrite with your own job.
Below the tool: what a general contractor's estimate has to contain, how to structure deposits and milestone draws (including where the law caps the deposit), how to handle allowances and unknowns, what to say about permits and change orders, and what happens after the owner signs.
How to write a construction estimate
- Add your business and license
Company details, logo and the license or registration number required on the proposal.
- Enter the owner and the project address
Name, contact details and the property.
- Number and date it, and set the valid-until date
The number is prefilled; set a validity window that reflects material pricing.
- Write the scope by division, one line each
Demolition, framing, rough plumbing, electrical, tile and finishes as rows, with the specifics that prevent arguments in the details.
- Add allowances, permits and exclusions
Allowances with the per-unit basis; permits and inspections with who pulls them; exclusions in writing.
- Set the payment schedule, deposit and change-order process
Milestone-based payments and the deposit (within any state cap) in the notes; how changes get priced and signed; upgrades marked Optional.
- Download, send, and convert when signed
Text or email the PDF. When the owner signs, untick Optional on accepted upgrades and press Convert to invoice.
What to include on a construction estimate
What should a construction estimate include?
Scope by division, the assumptions and exclusions behind each price, allowances and how they reconcile, the payment schedule, permit and change-order rules, and the calendar. That is more than most trades put on an estimate because a general contractor is pricing three months of other people's work against the owner's tolerance for surprises.
Price each division on its own line the way you will bill it. "Bathroom remodel — $18,365" is a number; "Demolition and disposal — $2,400 · Rough plumbing — $3,800 · Electrical — $2,150 …" is a schedule of values the owner can read, a bank can fund, and you can bill in three progress applications. The details line under each says what is included — "cement board, waterproofing membrane, thinset, grout and sealer" — so waterproofing is never a debate.
- Exclusions. Structural repairs found after demo, hazardous materials, work outside the room, furniture moving and storage.
- Allowances with the unit basis and the statement that they reconcile at cost on the final invoice.
- Permits: who pulls them, fees at cost, inspections gate the draws.
- Payment schedule tied to milestones, with the deposit stated.
- Change-order rule, schedule and hours, warranty, license number, valid-until date.
The seven-step method in how to write an estimate for a construction job — including the markup-versus-margin math that trips up half the trade — is the process behind this page.
How should a general contractor structure the deposit and draws?
Deposit on signing, then draws at inspections and visible milestones, with the balance at the final walkthrough — sized so the owner has always paid for roughly what has been built. On a mid-size remodel that is a modest deposit, two or three draws and a final payment; on a small job, thirds. The table below is this page's bathroom sample.
The deposit is where state law bites. California's Contractors State License Board says a home-improvement down payment "cannot be more than $1,000 or 10 percent of the contract price, whichever is less," with no exception for special-order materials, and adds that subsequent payments should not exceed the value of work completed or materials delivered. Several other states cap deposits at a third of the contract price; some do not cap them at all. The contractor deposit guide lists the ones verified against the statute; print a deposit that is legal in your state and let the draws carry the protection.
Tie draws to inspections: a calendar date is arguable; a passed rough inspection is a fact with a city stamp on it. And take the deposit the minute the owner signs — the acceptance block and a card or ACH link on the PDF turn "I'll get you a check" into money in the account.
How do you handle allowances and unknowns in a construction bid?
Allowances for what the owner has not picked yet; unit prices for what you cannot see yet; a written change-order rule for everything else. An allowance is a placeholder budget — "tile allowance $6 per sq ft, 210 sq ft, reconciled at cost on the final invoice" — that lets you price the job before the owner has been to the tile showroom. Set it at a realistic mid-range number: a $2 allowance that becomes a $9 selection makes the overage look like your fault.
Unknowns get a unit price instead of a guess. "Subfloor replacement, if required after demolition: $14 per sq ft" is a price the owner already agreed to when the rot shows up, and it turns a bad afternoon into a two-line change order. For what you can neither price nor predict — a slab that is not where the plans say, knob-and-tube in the walls — say it is excluded and priced on a written change order before work proceeds.
What should the estimate say about permits, inspections and change orders?
That you pull the permits, that fees are billed at cost, that inspections gate the draws, and that nothing changes without a signed change order. Owners assume the first three and forget the fourth, so the change-order sentence is the one to read aloud: any change in scope, including hidden conditions found after demolition, is priced on a written change order signed before that work proceeds.
That sentence is close to the law in some states. California's CSLB tells consumers a change to price or scope "MUST be done with a written 'Change Order,' signed by the customer and contractor prior to the change." Other states are looser on paper and identical in court: the change you cannot show a signature for is the change you eat. The free change order template produces the signed document in about a minute on a phone, roughly how long an owner will wait in a half-demolished bathroom.
Permits protect you as much as the owner: a permitted job with passed inspections is one an owner cannot later call defective without arguing with the city. Put permit fees on their own line at cost, non-taxable, and say who schedules the inspections. An owner who wants to skip the permit to save the fee is a customer to think hard about; how to vet a customer before you quote exists for that conversation.
How long is a construction estimate valid, and what happens after acceptance?
Thirty days, because material prices and your calendar both move: a bid priced in March against lumber and cabinet quotes does not survive a June signature untouched. Print the date; if the owner signs after it, re-confirm the material lines before taking the deposit instead of quietly absorbing the difference.
After acceptance, the signed estimate is the contract's scope and price, and its divisions become the schedule of values. Convert to invoice carries the accepted lines, the customer and the deposit into the invoice generator — for a progress-billed job that first invoice is application #1, and you replace each full division amount with this period's earned fraction. The general version is the free estimate template; the construction invoice page covers the progress-billing mechanics.
FAQ
How detailed should a general contractor's estimate be?
Detailed enough to bill against. Price each division — demolition, rough plumbing, electrical, tile, drywall and paint — on its own line with what it includes, because those lines become the schedule of values for your progress invoices. Add exclusions, allowances, permits, a payment schedule and the change-order rule.
How much deposit can a general contractor take?
It depends on the state. California caps home-improvement down payments at 10% of the contract price or $1,000, whichever is less; several states cap them at one-third; others set no limit. Check your state's contractor board, then let a milestone draw schedule carry the rest of the protection.
What is an allowance on a construction estimate?
A placeholder budget for a selection the owner has not made yet — tile, fixtures, a vanity — stated with its unit basis, such as $6 per square foot. When the owner chooses, the actual cost replaces the allowance and the difference is billed as an overage or credited back on the final invoice.
Should draws be tied to dates or milestones?
Milestones, and ideally inspections. A passed rough-in inspection is a fact the owner cannot dispute; a calendar date is an argument waiting to happen. A common residential schedule is a deposit on signing, draws at rough inspection and at a visible stage like tile complete, and the balance at final walkthrough.
Do I need a written change order for every change?
Yes. Some states require it — California's CSLB says a change to price or scope must be a written change order signed by both parties before the change — and everywhere else an unsigned change is unenforceable in practice. State the rule on the estimate and use a change-order form that shows the revised contract total.
How long should a construction estimate be valid?
Thirty days is the working norm. Material prices and your schedule both move; if the owner signs after the date, re-confirm the material and allowance lines before taking the deposit.
Should permit fees be included in the estimate total?
Yes, as their own line billed at cost and marked non-taxable, with a note that you pull the permits and schedule the inspections. Owners should see the fee, and see that it carries no markup.
More free contractor tools
Keep reading
- Free contractor estimate generatorThe generic version of this tool — optional add-ons, deposit and acceptance block for any trade.
- Free construction invoice templateWhere the accepted estimate goes next — progress billing against the schedule of values, with retainage.
- Free change order templateThe signed document for every scope change, with the revised contract total and both signatures.
- CRM for general contractorsEstimates with approve-and-pay links, deposits by card or ACH, customer vetting and progress invoices — how TrustPro fits a GC.
- How to write an estimate for a construction job (7 steps)The process behind this page, including why a 30% markup is not a 30% margin.
Send the estimate from the driveway and take the deposit before you leave
TrustPro sends estimates by text and email, collects the deposit online by card or ACH, converts the approved estimate to an invoice with one tap, and lets you check the customer against a contractor-side vetting network before you quote. From $29/month, 14-day free trial, no credit card.